Näytä kaikki

Katso englanninkielisestä versiosta virallisena versiona.Palata

Eurooppa
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Aasia/Tyynenmeren alue
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
Afrikka, Intia ja Lähi -itä
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
Etelä -Amerikka / Oseania
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
Pohjois -Amerikka
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
KotiTuotteetKehityslevyt, sarjat, ohjelmoijatArviointikortit - AnturitTMP112EVM
TMP112EVM Image
Kuva voi olla esitys.
Katso tuotteiden yksityiskohdat.
EXPRESS -VAIHTOEHTO
Maksutapa

TMP112EVM - Texas Instruments

Valmistaja Osa numero
TMP112EVM
Valmistaja
Texas Instruments
Allelco Osa numero
98D-TMP112EVM
Takuu
1 vuoden Allelco -takuu - Lisätietoja
Osien kuvaus
EVAL BOARD FOR TMP112
Paketti
Box
Tietolomake
1.TMP112EVM.pdf ...

HTML -tietolehti

TMP112 Datasheet.pdf
Sertifiointi
Varastossa: 43353
  • Yksikköhinta: $161.76
  • Välisumma: $0.00

Haluatko paremman hinnan?
Lisää CART ja lähettämään RFQ nyt, otamme sinuun heti yhteyttä.

Määrä Yksikköhinta Alanumero.Hinta
1+ $161.76 $161.76
200+ $151.93 $30,386.00
500+ $146.85 $73,425.00
1000+ $144.34 $144,340.00
Yllä olevat hinnat eivät sisällä veroja ja tavarahintoja, jotka lasketaan tilaussivuilla.
EXPRESS -VAIHTOEHTO
Maksutapa
Sertifiointi

tekniset tiedot

TMP112EVM -teknologiavaatimukset
Texas Instruments - TMP112EVM Tekniset eritelmät, ominaisuudet, parametrit ja osat, joilla on samanlaiset eritelmät kuin Texas Instruments - TMP112EVM

Tuoteominaisuus Attribuuttiarvo  
Valmistaja Texas Instruments  
Jännite - Supply -  
Hyödynnetään IC / Part TMP112  
Toimitetaan sisältö Board(s), Cable(s)  
Sarja -  
anturin tyyppi Temperature  
Tuoteominaisuus Attribuuttiarvo  
Herkkyys ±1°C  
Sensing Range -40°C ~ 125°C  
Paketti Box  
liitäntä I²C  
Sulautettu No  
Perustuotteenumero TMP112  

Ympäristö- ja vientiluokitukset

MääRITE KUVAUS
RoHs-tila Ei sovellettavissa
Kosteuden herkkyystaso (MSL) 1 (Unlimited)
Saavuttaa tila REACH Unaffected
ECCN EAR99
HTSUS 8473.30.1180

Osat, joilla on samanlaisia eritelmiä

Kolmella oikealla olevalla osalla on samanlaiset eritelmät kuin Texas Instruments TMP112EVM.

Tuoteominaisuus TMP112EVM TMP114EVM TMP114NAIYMTR TMP112AIDRLRG4
Osa numero TMP112EVM TMP114EVM TMP114NAIYMTR TMP112AIDRLRG4
Valmistaja Texas Instruments Texas Instruments Texas Instruments Texas Instruments
Jännite - Supply - 1.4V ~ 3.6V 1.08V ~ 1.98V -
Sulautettu No Yes, MCU, 16-Bit - -
Sensing Range -40°C ~ 125°C -40°C ~ 125°C - -
Perustuotteenumero TMP112 - - -
Toimitetaan sisältö Board(s), Cable(s) Board(s) - -
Herkkyys ±1°C ±1°C - -
liitäntä I²C I2C - -
Paketti Box Box Tape & Reel (TR) -
Hyödynnetään IC / Part TMP112 TMP114 - -
anturin tyyppi Temperature Temperature Digital, Local -
Sarja - - - -

TMP112EVM Datalta PDF

Lataa TMP112EVM PDF -lehdet ja Texas Instruments -dokumentaatio TMP112EVM - Texas Instruments: lle.

HTML -tietolehti
TMP112 Datasheet.pdf

asiakkaiden arvostelut

Arviointi: 10 Artikkelit

  • Jess***Jones
    17.04.2026

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    17.04.2026

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    03.04.2026

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    03.04.2026

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    23.03.2026

    Very good. No issue after long time testing.

  • Kevi***.
    17.03.2026

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    16.06.2024

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    19.06.2024

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    19.06.2024

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    19.06.2024

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Kirjoita arvostelu

Sähköpostiosoitettasi ei julkaista.

lähetys

Toimitusaika

Varastossa olevat esineet voidaan lähettää 24 tunnin sisällä.Jotkut osat järjestetään toimitukseen 1-2 päivän kuluessa päivämäärästä, jolloin kaikki tavarat saapuvat varastoon.Ja Allelco -laiva tilaa kerran päivässä noin klo 17.00, paitsi sunnuntaina.Kun tavarat on lähetetty, arvioitu toimitusaika riippuu kuljetusmenetelmistä ja toimituskohdista.Seuraavassa taulukossa on logistinen aika joillekin yleisille maille.

Toimituskustannukset

  1. Käytä pikatiliäsi lähetykseen, jos sinulla on sellainen.
  2. Käytä tiliämme lähetykseen.Katso alla olevasta taulukosta likimääräiset maksut.
(Eri aikataulun / maiden / pakettien koon hinta on erilainen.)

Toimitusmenetelmä

  1. Tuki DHL / UPS / FedEx / TNT / EMS / SF: n globaali yhteinen lähetys.
  2. Muut enemmän lähetystapoja, ota yhteyttä asiakaspäällikköösi.

Yleismaiden logistisen ajan viite
Alue Maa Logistinen aika (päivä)
Amerikka Yhdysvallat 5
Brasilia 7
Eurooppa Saksa 5
Yhdistynyt kuningaskunta 4
Italia 5
Oseania Australia 6
Uusi -Seelanti 5
Aasia Intia 4
Japani 4
Lähi -itä Israel 6
DHL & FedEx -lähetysmaksut Viite
Lähetysmaksut (kg) Viite DHL (USD $)
0,00 kg-1.00 kg 30,00 dollaria - USD 60,00 dollaria
1,00 kg-2,00 kg USD 40,00 dollaria - 80,00 dollaria USD
2,00 kg-3,00 kg USD 50,00 dollaria - USD 100,00 dollaria
Huomaa:
Yllä oleva taulukko on tarkoitettu vain viitteeksi.Hallitsemattomille tekijöille voi olla jonkin verran tiedon puolueellisuutta.
Ota yhteyttä, jos sinulla on kysyttävää.

Maksutuki

Maksutapa voidaan valita alla esitetyistä menetelmistä: Langansiirto (T/T, pankkisiirto), Western Union, luottokortti, PayPal.

Uskollinen toimitusketjun kumppani -

Ota yhteyttä, jos sinulla on kysyttävää.

  1. Puhelin
    +00852 9146 4856

Sertifikaatit ja jäsenyydet

Katso lisää
TMP112EVM Image

TMP112EVM

Texas Instruments
98D-TMP112EVM

Haluatko paremman hinnan? Lisää CART ja lähettämään RFQ nyt, otamme sinuun heti yhteyttä.

0 RFQ
Ostoskärry (0 Items)
Se on tyhjä.
Vertaa luettelo (0 Items)
Se on tyhjä.
Palaute

Palauttellasi on merkitystä!Allelco: ssä arvostamme käyttökokemusta ja pyrimme parantamaan sitä jatkuvasti.
Ole hyvä ja jaa kommenttisi kanssamme palautteen kautta, ja vastaamme nopeasti.
Kiitos, että valitsit Allelco.

Kohde
Sähköposti
Kommentit
Captcha
Vedä tai napsauta Voit ladata tiedoston
Lataa tiedosto
Tyypit: .xls, .xlsx, .doc, .docx, .jpg, .png ja .pdf.
Max -tiedoston koko: 10 Mt